(14 Oct - 18 Oct 2013)
"MID SEMESTER BREAK"
"MID SEMESTER BREAK"
Week 6 until week 9 (21 Oct - 15Nov 2013)
Title : Report Progress
Objective : Proposal report
Content : Next, from 21 October until 1 November (week 6 and 7) I describe the scope and limitation of the cable. All the information gets from the Electrical System in Building (ESB) book.. The complete section is compiling with the section 1 (introduction). I brief about the history and abstract of the project. Section 2(literature review, I brief about the previous approaches of electrical network design and present approaches which is using MATLAB application. Section 3(methodology), it’s all about the method that I used (MATLAB, GUI). I need to finish all the section of report completed by week 13. I need to prepare for the presentation day for FYP 1 on 22 November 2013.
PROBLEM ENCOUNTERED
During the research for the project, the problem
that encounter is they are too many method or stage that are need to apply
while doing the electrical network design. I have to select the best one as a
revision. And there has many types of cable that are use and I need to look up
one by one.
CONCLUSION
My research project is on schedule and I should
finish by week 13.