Sunday, March 9, 2014

Week 5 (3 March - 9 March 2014)

Title: Project progress (FYP 2)
Objective: Result
Content: Week 5, it still in progress. The GUI figure below is the parameter that I used for case study 1.        
                                                                                                                                                                        



The figure shown the final parameter that I want to use. When user click conductor information, and it will connect to conductor information.  Figure 1 is the parameter that user key in to get the IB value. The figure 2 is the parameter to get the It,min of the cable.